We’ve had more photos through from Braidbar showing the build. Some were from last week and some today.
The huge plastic trays which will hold our batteries have arrived, and been put under the bed.

In the shower room, the basin unit has been built, and now even has a basin. And there’s a lined shower cubicle.



The building of the dinette is coming on.

You can also see the C-shaped bulkhead between the dinette and the galley. From the other side, you can see where the little freezer is going, under the dinette.

In the engine room, there’s the start of all the electrical cupboards. In addition, there’s are lots of fuel and water pipes in place.

The engine has also arrived on a pallet!
