Floating again

We have been up to Braidbar today, and the best news is that water levels on the Macc have improved and all boats are floating again.

That means that all being well, Kingley Vale should be moved into the paint dock next week.

Inside, there have been some big changes. The galley worktops have been installed and look great — they’re protected by cardboard, so we had to lift that to have a look.

The same carbon quartz has been used on the shower room unit.

Back in the galley we have the start of high level cupboards, and in the rest of the boat some of the trim has been fitted.

The tiles should be going on the hearth soon too.

In the engine room, there are even more cables!

Leave a Reply

Your email address will not be published. Required fields are marked *

Proudly powered by WordPress | Theme: Wanderz Blog by Crimson Themes.